webleads-tracker

Maintenance area - London Underground

The company Tube Lines, responsible for maintenance and the improvement of the infrastructure on the lines of the London Underground commissioned Spaciotempo UK with the creation of a temporary maintenance workshop.

This 1,960 m² (14 m x 140 m) workshop, assembled in just 3 weeks, enables the maintenance teams to work on out of service carriages and to install a new, high-performance signalling system.

Based on a high-resistance aluminium framework, the removable warehouse offers an optimised workspace and remarkable stability. In particular, the workshop is equipped with an extremely powerful lighting system, a compressed air network and 28 jacks for lifting the trains.

This metallic building enables the performance of technical operations alongside the use of the underground lines, thus ensuring that there is no disruption to traffic.